Third Mainland Bridge: Lagos To Close Down Oworonshoki Bound Lane On Saturday

The Oworonshoki bound lane of the Third Mainland Bridge will be closed totally to vehicular movement by midnight on Saturday, 6th February 2021, till 7p.m on Sunday, 7th February 2021, for removal of the last expansion joint on the Oworonshoki bound lane.

A statement released by the Ministry of Transportation explained that the closure is vital to enable the contractor move their equipment to the Oworonshoki bound lane within the given period without any interruption by vehicular movement on the bridge.

ALSO READ  Lagos Pays N215m To Relatives Of 60 Deceased Employees

Explaining the planned closure, the Commissioner for Transportation, Dr. Frederic Oladeinde, stated that the rehabilitation process is being enhanced to ensure that set deadlines are met.

Motorists from Ogudu, Alapere and Gbagada are advised to use Ikorodu Road, Jibowu and Yaba as alternative routes, while Iyana Oworosoki-bound traffic from Lagos Island, Iddo, Oyingbo, Adekunle and Yaba should use Herbert Macaulay Way, Jibowu and Ikorodu Road as alternative routes.

ALSO READ  Femi Otedola To Shut Down Lagos For Dad's May 30 Burial

The Transport Commissioner assured that Traffic Management Personnel have been deployed along the affected routes to minimise and address any traffic impediments during the closure.

The State Government appealed for cooperation by residents as the ongoing repair work on the bridge is for the safety of all and sundry, noting that the Babajide Sanwo-Olu led administrationwill not relent in ensuring safety on Lagos roads.

Share This Post

Leave a Reply

%d bloggers like this: